Skip to content
Commercial ironwork

Welding services

Custom welding services for fabrication, repair, and installation — MIG, TIG, and stick welding for steel, iron, and aluminum. We work on commercial projects, equipment repairs, structural connections, and custom metal fabrication.

Call our team today.
Welding services

What's included

  • MIG, TIG, and stick welding on steel, iron, and aluminum
  • Custom bracket and fitting fabrication
  • Structural connection welding
  • Equipment and machinery repair
  • Pipe and tube welding
  • Surface grinding and finishing

How we quote it

  • Material type and thickness
  • Weld process required (MIG, TIG, or stick)
  • Joint type and access
  • Quantity and repetition
  • Finish requirements

We quote on project scope, material, and complexity — not a flat rate. You get one written quote from us.

Ballpark prices

Mobile weldingper hour, on site$65–$150
Small on-site repairtypical project$300–$900

Ballpark 2026 Massachusetts prices, for planning only. Your exact price comes in a written quote after we review the drawings or the site.

Request an estimate

About welding services

Commercial welding work falls into three groups. Fabrication is building new parts in a shop: brackets, frames, supports, stair stringers, guards, and custom components. Field welding is done where the work sits: structural connections, embed plates, railing and guard installs, and modifications to existing steel. Repair welding fixes what's already there, from cracked equipment frames and dock plates to broken railings and gates.

The process depends on the material and the job. MIG (GMAW) is fast and common for steel fabrication. TIG (GTAW) gives precise, clean welds and is used on stainless steel, aluminum, and thin or visible work. Stick (SMAW) and flux-cored welding handle outdoor field work and thicker structural joints, where wind and position make other processes harder. Our team picks the process to fit the joint, the position, and the finish required.

Shop work is usually faster and more economical because the welder has positioning equipment and controlled conditions. Field work costs more in setup and time but is the only option for steel that can't be moved. A good quote spells out which parts of the job happen where.

How the project works

  1. Describe the job

    Send photos, the material, rough dimensions, and any drawings. We review the job and line up the right process and crew.

  2. Assessment

    Our team reviews material, thickness, joint access, and whether it's shop or field work, and asks about any code, testing, or inspection requirements.

  3. Quote and scheduling

    You get a quote that separates shop and field time. Field work in an occupied building is scheduled around operations and any hot work permit.

  4. Prep, welding, and finish

    Our crew cleans, bevels, and fits up the joint, welds it, then grinds, paints, galvanizes, or coats as specified.

  5. Inspection and handoff

    Our crew inspects the finished welds, and third-party testing is arranged where the project requires it.

Materials and finishes

Mild (carbon) steel

The most common material in commercial welding. It welds well with every major process, but it needs paint, powder coat, or galvanizing outdoors to resist rust.

Stainless steel

Corrosion resistant and used for food-service, marine, and architectural work. It is usually TIG welded, costs more, and takes care to avoid contamination and heat discoloration.

Aluminum

Light and rust-free, but it needs clean prep and TIG or spool-gun MIG welding. Welding can weaken heat-treated aluminum near the joint, so some aluminum repairs are better handled by replacing the part.

Cast and wrought iron

Older ornamental and cast iron can often be repaired, but cast iron is brittle and needs preheating and specialized technique. Some cast pieces are better brazed or replaced, and our team will say which.

Massachusetts code and permits

Welding in Massachusetts touches two sets of rules. Structural welding falls under 780 CMR, the state building code (IBC-based for commercial buildings), and project specs commonly require welders qualified to AWS D1.1 for structural steel, with special inspection where the building official requires it. Separately, cutting and welding in or near an existing building is hot work, which under the Massachusetts fire code (527 CMR) generally requires a permit from the local fire department, a fire watch, and cleared combustibles. Your local building and fire departments have the final say.

What affects the price

  • Material type and thickness
  • Weld process and position (flat, vertical, or overhead)
  • Shop vs. field work, and site access
  • Number of parts and how repetitive they are
  • Prep and finish: grinding, coatings, or galvanizing
  • Testing, welder qualification, or documentation requirements
  • Hot work permits, fire watch, or after-hours scheduling

Frequently asked questions

Do you do on-site welding or shop welding?
Both — we weld in-shop for fabricated parts and components, and do field welding for structural connections and repairs that can't be moved.
What materials do you weld?
We work with mild steel, stainless steel, wrought iron, and aluminum. Let us know your material and we'll recommend the right process.
Can you repair existing ironwork or equipment?
Yes — repair welding is a big part of what we handle, from broken railings and gates to equipment frames and structural connections.
How do you price welding work?
Welding is quoted on material, process, time, and access. Shop work is typically more efficient than field welding. Share your project details and we'll get you a written quote.
Do I need a certified welder for structural work?
Usually, yes. Structural steel projects commonly specify welders qualified to AWS D1.1, and the engineer or building official may require proof of qualification and inspection of the welds. Tell us the project's requirements and we'll quote to meet them.
Do I need a hot work permit for welding in Massachusetts?
Usually, yes, for welding or cutting in or near an existing building. Hot work permits are issued by the local fire department under the Massachusetts fire code and typically require a fire watch and cleared combustibles. Our team can coordinate the permit with you or your facility manager.
MIG vs TIG welding — which do I need?
It depends on the material and the finish. MIG is faster and is the default for most steel fabrication and repair; TIG is slower but more precise and is the usual choice for stainless steel, aluminum, thin material, and visible welds. Our team recommends the process based on the job.
Can cast iron be welded?
Sometimes. Cast iron is brittle and cracks easily under welding heat, so repairs need preheating, special filler, and slow cooling, and some parts are better brazed or replaced. Our team assesses the piece before quoting.