Structural steel fabrication and installation for commercial buildings, additions, and industrial projects. We handle custom steel beams, columns, lintels, and connections — fabricated and installed by Mass Ironworks.

Call our team today.
Structural steel

What's included

  • Structural steel fabrication per engineering drawings
  • Beam, column, and lintel installation
  • Welded and bolted connections per spec
  • Coordination with general contractor schedule
  • Primer coat and surface preparation
  • Field modifications as required

How we quote it

  • Structural drawings or load requirements
  • Steel section sizes and total tonnage
  • Connection type (welded, bolted, or both)
  • Site access and lift requirements
  • Lead time and installation schedule

We quote on project scope, material, and complexity — not a flat rate. You get one written quote from us.

Ballpark prices

Steel beam, fabricated and installedper linear foot, installed$110–$480
Single steel beam, typical openingeach, installed$1,300–$5,000
Steel lintel replacement, one door or windoweach, installed$600–$2,500

Ballpark 2026 Massachusetts prices, for planning only. Your exact price comes in a written quote after we review the drawings or the site.

Request an estimate

About structural steel

Commercial and light-industrial structural steel work in Massachusetts covers a wide range: lintels and beam pockets in masonry openings, steel beams and posts that replace load-bearing walls in renovations, columns and frames for additions, mezzanines, canopies, roof dunnage for rooftop equipment, and steel stairs and platforms. Much of it happens inside existing buildings, where access, shoring, and coordination with other trades drive the schedule as much as the steel does.

The work follows the structural engineer's design. The engineer of record sizes the members and connections; our crew prepares shop drawings from the contract documents, submits them for review, fabricates once they're approved, and then erects and connects the steel in the field. On renovations, we typically field-verify existing conditions before fabrication so beams fit the openings that are actually there.

Connections are where structural jobs are won or lost. Bolted connections go up faster in the field; welded connections may be needed for certain frames or where bolting isn't practical. The project spec sets which, along with bolt grades, weld requirements, coatings, and any inspection requirements.

How the project works

  1. Send the scope

    Share drawings, specs, and the schedule. We scope the job and schedule fabrication and install capacity to fit it.

  2. Takeoff and quote

    Our team reviews the drawings, flags gaps or questions for the engineer, and quotes fabrication and erection, noting exclusions such as shoring, crane time, or fireproofing.

  3. Shop drawings and submittals

    Shop drawings and material submittals go to the engineer and architect for review before any steel is cut.

  4. Fabrication

    Members are cut, drilled, welded, and primed or galvanized per spec, then staged for delivery in erection sequence.

  5. Erection and closeout

    Steel is set, plumbed, and connected; required inspections happen as work proceeds; punch list items and close-out documents finish the job.

Materials and finishes

Wide-flange beams and HSS columns

The workhorse sections for beams, posts, and frames. Sizes come from the engineer's design, and less common sizes can carry longer lead times that affect the schedule.

Shop primer

Standard for interior steel that will be enclosed or fireproofed. It protects the steel during construction but is not a long-term exterior finish.

Hot-dip galvanizing

The usual choice for exterior and exposed steel such as lintels, canopies, dunnage, and loading-dock work exposed to moisture and road salt. It adds a step to the schedule and should be planned into the fabrication sequence.

Paint over galvanizing (duplex system)

For exposed steel that needs a color and long-term corrosion protection, a coating system over galvanizing gives both. It should be specified up front because it changes surface preparation.

Massachusetts code and permits

Commercial structural steel in Massachusetts falls under 780 CMR, the state building code, which is based on the IBC for buildings other than one- and two-family homes. Structural work requires a building permit with engineer-stamped construction documents, and the building official may require special inspections of steel fabrication, high-strength bolting, and welding, typically performed by an independent agency engaged by the owner or the design professional. Structural welding is commonly specified to AWS D1.1. Your local building department and the engineer of record have the final say on what your project requires.

What affects the price

  • Total tonnage and number of pieces
  • Connection design: shop-bolted, field-bolted, or field-welded
  • Coating: shop primer, galvanizing, or a duplex system
  • Site access, crane or lift requirements, and work inside an occupied building
  • Shoring and temporary support during installation
  • Schedule, phasing, and after-hours work
  • Special inspection and documentation requirements

Frequently asked questions

Do you work from engineer-stamped drawings?
Yes — our crew fabricates to engineer-stamped drawings and coordinates with the structural engineer of record on any field questions or substitutions.
Do you install as well as fabricate?
Yes — we both fabricate and install in the field, so your project stays on one contract with a single point of coordination.
What project sizes do you handle?
We handle projects ranging from single lintels and beam pockets to multi-bay structural frames for additions and commercial renovations. Tell us your scope and we'll let you know if it fits.
What insurance and certifications apply to structural work?
Tell us what your project requires, including any insurance certificate or certification, and we will address it in the written quote.
Do I need a structural engineer to replace a load-bearing wall with a steel beam?
Yes, in nearly every case. Replacing a load-bearing wall needs an engineer to size the beam, posts, and footings, and the stamped design is part of the building permit. Our crew fabricates and installs to that design and can often point you to engineers who do this kind of work regularly.
Does structural steel work need a building permit in Massachusetts?
Yes. Structural work is permitted work under 780 CMR, with stamped drawings and inspections, and larger projects may also require special inspections of welding and bolting. Your local building department confirms exactly what's needed.
Galvanized vs primed structural steel — which do I need?
Galvanized for steel exposed to weather, primed for steel that stays inside. Shop primer protects interior steel during construction before it's enclosed or fireproofed; hot-dip galvanizing is the durable choice for lintels, canopies, and exterior frames exposed to New England moisture and salt. The project spec should state which.
How long does structural steel fabrication take?
It depends mostly on shop drawing approval and material availability. Small jobs like a lintel or a single beam can turn around in a few weeks; larger frames take longer because shop drawings, submittals, and galvanizing each add steps. Our team gives you a schedule with the quote.